Analysis of the Indian Pre-engineered Buildings Market

Analysis of the Indian Pre-engineered Buildings Market

Kindled by Increasing Acceptance Level, Faster Construction, and Flexibility in Expansion

RELEASE DATE
24-Dec-2012
REGION
Asia Pacific
Research Code: P6B9-01-00-00-00
SKU: EN00821-AP-MR_08540
AvailableYesPDF Download

$4,950.00

Special Price $3,712.50 save 25 %

In stock
SKU
EN00821-AP-MR_08540

$4,950.00

$3,712.50save 25 %

DownloadLink
ENQUIRE NOW

Description

The Indian pre-engineered buildings market is on a growth trajectory due to high growth expected construction, infrastructure, and industrial sectors. Ease of installation, faster completion, flexibility in design, expandability, workshop fabrication, recyclable material, and energy efficiency are the factors leading to increased awareness level. Steel remains the default construction material in the industrial segment. However, the penetration of PEB in building segment is slow and mainly concentrated on metro cities. Increasing steel prices, Workshop fabrication, availability of skilled manpower, and high cost of manpower are some of the key issues facing the market, which will in turn increase the cost of the PEB in the long run.

Table of Contents

Pre-Engineered Building Market Study in India

  • Analysis of the Pre-Engineered Buildings Market Study
The Indian pre-engineered buildings market is on a growth trajectory due to high growth expected construction, infrastructure, and industrial sectors. Ease of installation, faster completion, flexibility in design, expandability, workshop fabrication, recyclable material, and energy efficiency are the factors leading to increased awareness level. Steel remains the default construction material in the industrial segment. However, the penetration of PEB in building segment is slow and mainly concentrated on metro cities. Increasing steel prices, Workshop fabrication, availability of skilled manpower, and high cost of manpower are some of the key issues facing the market, which will in turn increase the cost of the PEB in the long run.
More Information
No Index No
Podcast No
Author Vivek Vijayakumar
WIP Number P6B9-01-00-00-00
Is Prebook No